Overview of NCCCO and Why Barge Work Matters for the Exam
The CCO Mobile Crane Operator certification (most people on a jobsite still call it NCCCO) is earned by passing a Core written exam, at least one Specialty written exam, and a practical exam for each Specialty. Per the CCO Mobile Crane Operator Candidate Handbook, the Core written exam is 95 questions in 90 minutes with no calculator, split into four domains: Site (about 22%), Operations (about 28%), Technical Knowledge (about 23%) and Load Charts (about 27%). Each Specialty written exam is 28 questions in 60 minutes with a calculator permitted. CCO does not publish a pass rate or a percentage cut score; the exams are criterion-referenced. Certification is valid for five years. CCO does not publish a list of which OSHA Subpart CC sections each Core question draws from, so we won't pretend barge work is a big slice of the test. What we can say is that 29 CFR 1926.1437, the OSHA section on floating cranes/derricks and land cranes/derricks on barges, is part of the same Subpart CC that governs the rest of your work, and it is the one place in the rule where a land-based habit ("the crane is level, so the chart applies") can get you hurt. It also pulls together ideas the exam does test heavily: level, radius, load chart limits, wind, and inspections. If you run cranes on marine construction, bridge work, dredging or dock jobs, this is daily-life material. If you don't, it's a compact way to sharpen your understanding of why a load chart is only valid under the conditions printed on it. Remember too that OSHA 1926.1427 is what requires construction crane operators to be trained, certified or licensed, and evaluated; CCO certification is one accredited route to the certification part.
Try it now — no account, no download
Practice Crane questions free
Answer 5 Crane practice questions with instant explanations before you keep reading.
Crane · Question 1 of 5
What is the definition of 'Gross Capacity' as listed in a crane's load chart?
Pick an answer to see the explanation + an instant AI breakdown.
Floating Crane vs. Land Crane on a Barge: The First Question to Ask
Section 1926.1437 splits marine cranes into two groups, and nearly every rule depends on which one you're looking at. **Floating cranes/derricks, 1926.1437(m).** Equipment designed by the manufacturer (or employer) for marine use by permanent attachment to the barge, pontoon or vessel. These run off a marine load chart. **Land cranes/derricks on flotation, 1926.1437(n).** A crawler or truck crane designed for use on land that is placed on a barge or other floating platform. These start with a land load chart that has to be reduced. **Scope, 1926.1437(a).** The section adds to the rest of Subpart CC; everything else in the subpart still applies unless 1437 says otherwise. One important carve-out: it does not apply when a jacked barge has its jacks deployed to the river, lake or sea bed and the barge is fully supported by the jacks. At that point you're treated as being on a supported platform, not floating. **Shared rules, 1926.1437(b).** Paragraphs (c) through (k) apply to both groups. Paragraph (m) is only for floating cranes and (n) is only for land cranes on barges. Paragraphs (i) and (l) are reserved (empty), which is worth knowing if a question cites them.
Free: the 20 facts Crane exams keep testing
Top 20 most-tested facts for your exam. Delivered instantly.
Work Area Control, Safety Devices and Operational Aids on the Water
**Swing area, 1926.1437(c).** The normal work area control rule in 1926.1424 applies, except 1926.1424(a)(2)(ii). The employer then has two options: erect and maintain control lines, warning lines, railings or similar barriers to mark the hazard-area boundaries, or mark the hazard areas with warning signs (OSHA's example is "Danger—Swing/Crush Zone") plus high-visibility markings on the equipment, and train each employee on what the markings mean. **Keeping clear of the load, 1926.1437(d).** Section 1926.1425 does not apply to this equipment. That surprises people. It does not mean anything goes; it means OSHA handled barge work separately because deck space and lift paths are different on the water. Expect a trick question here. **Extra safety devices, 1926.1437(e).** On top of the 1926.1415 safety devices, you need: 1. A list and trim device for the barge or vessel, located in the cab or, if there is no cab, at the operator's station (e)(1). 2. A positive equipment house lock (e)(2). 3. A wind speed and direction indicator, if a competent person determines wind must be considered (e)(3). **Operational aids, 1926.1437(f).** An anti two-block device is required only when hoisting personnel or hoisting over an occupied cofferdam or shaft (f)(1). The load weighing device rule in 1926.1416(e)(4) does not apply to dragline, clamshell (grapple), magnet, drop ball, container handling, concrete bucket and pile driving work under this section (f)(2). **Manuals and charts, 1926.1437(g).** With a cab, the normal 1926.1417(c) rule applies. With no cab, load charts are posted at the operator's station (or on the equipment if the station moves, as with a pendant control), and the other procedures, recommended operating speeds, special hazard warnings, instructions and operator's manual must be readily available on board.
Load Chart Basics: List, Trim and Freeboard
Here is where barge work becomes a load chart topic. **List** is tilt from side to side (port to starboard). **Trim** is tilt from bow to stern. **Freeboard** is the vertical distance between the waterline and the main deck, as defined in 1926.1437(m)(3). **Floating cranes, 1926.1437(m).** The manufacturer's marine load chart must not be exceeded, and all its parameters and limits (including dynamic and environmental ones) must be followed (m)(1)(i). Those charts must consider a minimum wind speed of 40 mph (m)(1)(ii). Maximum list and trim are set by Table M1 (m)(2): | Equipment | Max list | Max trim | |---|---|---| | Other than derricks, rated 25 tons or less | 5 degrees | 5 degrees | | Other than derricks, rated over 25 tons | 7 degrees | 7 degrees | | Derricks, any rated capacity | 10 degrees | 10 degrees | Stability must also meet Tables M2 and M3 (m)(3). Table M2 sets minimum freeboard, all at a 60 mph wind: 2 ft at rated capacity, 1 ft at rated capacity plus 25%, and 2 ft with high boom and no load. Table M3 covers backward stability of the boom: high boom, no load, full back list (the least stable condition) at 90 mph. Note that "rated capacity plus 25%" is a stability test condition in Table M2, not permission to overload. Employer-made floating equipment can't be used unless documents signed by a registered professional engineer, qualified in this kind of equipment including flotation, show the charts and parameters meet (m)(1) through (m)(3) (m)(4). **Land cranes on barges, 1926.1437(n).** This is the big one for most operators. The land rated capacity, including any modified load chart, must be reduced to account for the extra loading from list, trim, wave action and wind; it must apply to the specified location(s) on that specific vessel under the expected environmental conditions; and it must meet (n)(3) and (n)(4) (n)(1). The reduction is made by the manufacturer or by a qualified person with expertise in both land crane capacity and vessel stability (n)(2). OSHA does not print a percentage reduction. If a question gives you a single "standard" percentage for barge derating, be suspicious. List and trim for land cranes, (n)(3): the vessel's maximum allowable list and trim must not exceed the least of 5 degrees, the manufacturer's amount, or (if the manufacturer gives none) the qualified person's amount. The crane's own allowable list and trim must not exceed the manufacturer's figure, or the qualified person's if there is none. And under (n)(4), all deck surfaces of the vessel must stay above water and the entire bottom area must stay submerged.
Rigging Math: Why a Few Degrees of List Changes Your Radius
The Core exam is taken without a calculator, so you won't be asked for exact trig. You should, though, understand why a barge chart has to be derated. On land, a level crane keeps the boom angle and radius the chart assumed. On a barge, the deck tilts toward the load as you pick it, and the boom tilts with it. **Worked example (illustrative, not from any chart).** A 100 ft boom set at 60 degrees on a level deck has a radius of about 100 x cos 60 = 100 x 0.50 = 50 ft (ignoring the distance from centerline to boom foot). If the barge lists 5 degrees toward the load, the boom is effectively at 55 degrees to the water: 100 x cos 55 = 100 x 0.574, or about 57 ft. That's a radius jump of roughly 7 ft, about 15%, at the same boom angle reading relative to the deck. On most charts, capacity drops quickly as radius grows, and the tilt also side-loads the boom if the list is off the boom's axis. That's the logic behind (n)(1) and (n)(3): the land chart assumes a level, firm base, so a qualified person has to reduce it for the tilt, wave action and wind you will actually see, and the vessel has to stay within the list and trim limits. For the same reason, the 1926.1437(e)(1) list and trim indicator in the cab is not optional decoration. Treat it like your level bubble on land. **Quick ratios to remember.** Table M1: 5, 7, 10 degrees (small cranes, big cranes, derricks). Table M2: 2 ft, 1 ft, 2 ft of freeboard at 60 mph. Table M3: 90 mph backward stability. Land cranes on barges: no more than 5 degrees of vessel list or trim, deck edges dry, bottom fully wet. For the trig itself, see our [boom angle and radius guide](/blog/nccco-crane-boom-angle-radius-boom-length-trigonometry-exam-2026), and practice net-capacity math with the [crane load tool](/tools/crane-load).
Securing the Crane, Divers, Inspections and the Vessel Itself
**Securing land cranes, 1926.1437(n)(5).** A land crane on a barge must be held in place by one of four options: (1) physical attachment (crossed cables, bolting or welding, chains or other means); (2) corralling with barricade restraints that allow no shifting in any direction; (3) rails with rail clamps and rail stops, unless the system prevents movement another way; or (4) a centerline wire-rope system that is strong enough for the side load, physically attached to the vessel, lets the crane be secured during operation and repositioned lengthwise, keeps the crane from passing the fore or aft end of the attachments, and holds the crane in place during operation. The securing system must be designed by a marine engineer, a registered PE familiar with floating crane design, or a qualified person familiar with floating crane design (n)(5)(v). **Mobile auxiliary cranes on a floating crane's deck, (n)(6).** They can go unattached only under a written plan developed and signed by a marine engineer or registered PE. The plan specifies and marks the permitted deck areas, sets the dynamic and environmental limits, and requires attachment or corralling (Option 1, 2 or 4) if those limits are exceeded. **Working with a diver, 1926.1437(j).** If the crane puts a diver in or takes one out of the water, it can't be used for anything else until the divers are back aboard (j)(1). The operator stays at the controls at all times (j)(2). Besides the normal signal rules in 1926.1419 to 1926.1422, you keep a clear line of sight to the tender or the signals are sent electronically (j)(3). The securing means must not allow any shifting in any direction (j)(4). **Inspections, 1926.1437(h)**, are in addition to the 1926.1412 crane inspections: - **Each shift (h)(1):** securing means in proper condition, checking wear, corrosion, loose or missing fasteners, defective welds and, where applicable, tension. - **Monthly (h)(2):** securing means; the vessel isn't taking on water; deckload is secured; watertight integrity (chain lockers, storage, fuel compartments, hatches); firefighting and lifesaving equipment in place and working. - **Who does them (h)(3):** shift and monthly checks are by a competent person. A deficiency gets an immediate call by a qualified person; if it's a hazard, the vessel is out of service until corrected. - **Annual (h)(4):** an external inspection by a qualified person with vessel expertise, covering deck hardware (cleats, bitts, chocks, fenders, capstans, ladders, stanchions), leaks and structural damage, four-corner draft readings, firefighting equipment, and rescue skiffs, lifelines, work vests, life preservers and ring buoys. - **Every four years (h)(5):** an internal survey by a marine engineer, marine architect, licensed surveyor or other qualified person. - **Records (h)(6):** monthly and annual inspections documented per 1926.1412; the four-year inspection kept for at least 4 years. **The vessel, 1926.1437(k), (m)(5), (n)(7).** The barge must handle environmental, operational and in-transit loads per the manufacturer's specifications, and those limits (or a qualified person's, if none exist) must not be exceeded. Hulls must be structurally sufficient at maximum rated capacity, subdivided with one or more longitudinal watertight bulkheads to cut free-surface effect, and have access to void compartments for inspection and pumping. In a 2012 interpretation letter, OSHA explained the bulkhead rule is about reducing free-surface effect and capsizing risk, and described limited conditions under which older barges without longitudinal bulkheads would be treated as a de minimis violation. Read the letter before relying on that.
Practical Exam Tips
The CCO practical exam is a hands-on test of inspection, hoisting, booming, swinging, hand signals and combined operations with and without a load, per the candidate handbook. It's taken on land, so you won't be graded on barge work, but the habits behind 1926.1437 carry straight over. **Check level before you trust a number.** On a barge, that's the list and trim indicator. On the practical, it's your pre-operation walk-around and level check. Same mindset: confirm the conditions the chart assumes. **Move smoothly.** Barge cranes punish jerky swings and fast booming because every motion rocks the deck. On the practical, smooth control is what the examiner is watching for anyway. **Know your signals cold.** The diver rules in (j)(3) lean on the same 1926.1419 to 1926.1422 signal rules you'll use on test day. Review our hand signal and signal person material in the [crane study plan](/study/crane). **Respect wind.** Floating crane charts consider at least 40 mph, and the stability tables use 60 and 90 mph conditions. On land, the manufacturer's wind limits rule. Our [wind and environmental limits guide](/blog/nccco-wind-environmental-limits-crane-load-chart-2026) covers that side.
Common Mistakes on Floating Crane and Barge Questions
**Using the land chart as-is on a barge.** A land crane on flotation needs a reduced rating made by the manufacturer or a qualified person with both crane and vessel stability expertise (n)(1)-(2). **Inventing a derating percentage.** OSHA gives none in (n)(1). The reduction depends on the vessel, location and conditions. **Mixing up Table M1 and (n)(3).** Table M1 (5/7/10 degrees) is for floating cranes. Land cranes on barges cap vessel list and trim at the least of 5 degrees, the manufacturer's figure or the qualified person's figure. **Reading "rated capacity plus 25%" as an allowance.** It's a freeboard test condition in Table M2 (1 ft at 60 mph), not extra capacity. **Assuming 1926.1425 applies.** For this section it does not (1926.1437(d)); work area control is handled through 1926.1424 with the (c)(2) barrier or marking options. **Forgetting jacked barges.** If the jacks are down to the bed and fully supporting the barge, 1926.1437 doesn't apply (a). **Using a diver crane for other picks.** Not until the divers are back aboard (j)(1).
Study Strategy
This is a narrow topic, so give it one focused session and then fold it into mixed review. **Day 1: Build a number card.** Front: 5/7/10 degrees, 2 ft / 1 ft / 2 ft, 40, 60 and 90 mph, 5 degrees, 4 years. Back: the rule each number belongs to. Drill until you can explain every one without looking. **Day 2: Floating vs. land.** Write two columns, (m) and (n), and sort every rule into one, or into the shared (c)-(k) block. Most barge questions are really asking which column you're in. **Day 3: Tie it to the chart.** Work a few radius problems on the [crane load tool](/tools/crane-load), then ask how each answer would change with the deck tilted 5 degrees toward the load. Pair this with our [crane leveling and ground conditions guide](/blog/nccco-crane-leveling-out-of-level-setup-ground-conditions-osha-1926-1402-exam-2026), since list on a barge and out-of-level on land are the same idea. **Day 4: Mixed questions.** Run timed sets from [free NCCCO practice questions on VoltExam](/questions/crane), mixing load chart, signals and site questions so this topic sits in context with the rest of Subpart CC. Read 1926.1437 straight through once on osha.gov. It's short, and seeing the reserved paragraphs and the three tables on the page makes the structure stick.
Download the Crane Prep App
Barge questions reward people who know which rule belongs to which kind of crane and which number goes with which table. Download the Crane Prep app to drill OSHA Subpart CC rules, load chart problems and rigging math in short sessions between picks, and [try free NCCCO practice questions on VoltExam](/questions/crane) to see where you stand today. Want the full picture first? See the [Crane Prep app page](/apps/crane), work through the [crane study guide](/study/crane), and check chart math with the [crane load tool](/tools/crane-load). Practice questions are study support only; they don't replace hands-on training, the manufacturer's charts, or the official CCO handbook.
Sources
- OSHA 29 CFR 1926.1437, Floating cranes/derricks and land cranes/derricks on barges: https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.1437 - OSHA standard interpretation, July 27, 2012 (longitudinal watertight bulkheads on crane barges): https://www.osha.gov/laws-regs/standardinterpretations/2012-07-27 - OSHA 29 CFR 1926.1427, Operator training, certification, and evaluation: https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.1427 - CCO Mobile Crane Operator Candidate Handbook (exam format, domains, scoring, validity, recertification): https://www.nccco.org/docs/default-source/2025/mobile-crane-operator-candidate-handbook_111424---en.pdf?sfvrsn=e5e8c20e_2
Free Crane Tools
Studying with VoltAI
Stuck on a Crane question? Ask VoltAI why.
VoltAI is a built-in AI tutor that explains every practice answer in plain language — citing the actual code, protocol, or standard — and answers your follow-ups until it clicks. Most prep apps just tell you the right letter; VoltAI teaches the reasoning the exam actually tests, so you pass by understanding, not memorizing. Free to try, no account.
Try VoltAI free →Your next best step
Turn this guide into practice
Use the article to understand the topic, then do a short web practice session to find your weak spots. Paid web access is optional after the free preview.